City of Phoenix Scenario 6 Transmission Main Improvements
Location: Phoenix, Arizona
Marc Taylor Inc. provided preconstruction services for the replacement of approximately 3,400 linear feet of 42- inch transmission main discharging from the Deer Valley Water Treatment Plant. The $7.8 million new water transmission main replaced an existing 42-inch prestressed concrete cylinder pipe (PCCP) water transmission main.