View Post

City of Phoenix Scenario 6 Transmission Main

City of Phoenix Scenario 6 Transmission Main Improvements Location: Phoenix, Arizona Marc Taylor Inc. provided preconstruction services for the replacement of approximately 3,400 linear feet of 42- inch transmission main discharging from the Deer Valley Water Treatment Plant. The $7.8 …

View Post

Arizona State University – College Avenue Streetscapes

Arizona State University Location: Tempe, Arizona MTI provided a master plan and design services for the streetscape enhancement project of College Avenue between 6th and 7th streets. The $4.5 million included new grade plane surfaces, plantings, site amenities, grading and …

View Post

Continuum Chandler

Continuum Chandler Location: Chandler, AZ Marc Taylor Inc. provided the facility owner with detailed cost estimating and scheduling services for its signature science and technology business park. The $15 million project was a public/private infrastructure sub-parcel consisting of roads, infrastructure, …

View Post

Black Box Project

Black Box Project Location: Phoenix, Arizona Marc Taylor Inc. provided preconstruction estimating services on the new $8 million Black Box Theater construction, which was part of the multi-phased construction project. The 16,000 sf theater included theatrical lighting systems, pipe grid special …

View Post

West Palm Community Park

West Palm Community Park Location: West Palm Beach, Florida MTI provided program management and cost estimating services for the 12-acre $5 million park, which included a gateway plaza, multi-use fitness/walking trail, splash pad, playground and shade structure, 4 basketball courts, …

View Post

Gilbert Regional Park

Gilbert Regional Park & Rittenhouse District Park Location: Gilbert, Arizona Marc Taylor Inc. is currently serving as the Program Manager for Phase 1 of the tandem park projects, valued at $120 million. Features of the parks include entry monuments, lakes, …

View Post

Mesa High Regional Aquatic Center

Mesa High Regional Aquatic Center Location: Mesa, Arizona MTI provided preconstruction services for the development of a new $5.4 million aquatic complex on the Mesa High School campus. The project includes a lazy river, splash pad, ten racing lanes, a …

View Post

IXP Emergency Operations Center

IXP Emergency Operations Center Location: Cottonwood, Arizona MTI provided a master plan services for three site locations, which included evaluating infrastructure for special systems cabling and systems necessary to operate the Distribution Center along with a radio microwave support tower. The …

View Post

Mesa Police Department Firearms Range

Mesa Police Department Firearms Range Location: Mesa, Arizona Marc Taylor Inc. provided preconstruction services for the demolition of the existing observation tower, offices, ammunition storage, target, and tool buildings along with utility vehicle parking areas for the Mesa Police Department, …

View Post

Riverside Elementary – Third School

Riverside Elementary – Third School Location: Phoenix, Arizona Marc Taylor Inc. provided preconstruction services for the new $17 million science, technology, engineering, and mathematics (S.T.E.M.) school, consisting of 60,000 sf two-story building on a 12-acre site with collegiate level laboratory facilities.